...That the Commonwealth of Virginia, [shall complete] a comprehensive feasibility plan to … divert the maximum amount feasible of the long-haul, through-truck freight traffic to intermodal rail in the Interstate Route 81 Corridor…


A. Operating Characteristics

• Utilize existing VDOT or Norfolk Southern Shenandoah line right-of-way …

• Extend at least 500 miles, creating or expanding logical termini in Tennessee and Pennsylvania or New York with at least one intermediate terminal in Virginia;

• Utilize suitable "roll on/roll off" and other efficient rail technologies …

• Achieve truck-competitive transit times and reliability …

• Consider the option of a new rail right-of-way from Front Royal to Culpeper …


B. Financial Evaluation

• Capital cost of upgrading and construction for rail …

• Operating cost for the level of rail service needed to achieve truck-competitive speed and reliability;

• … performance criterion of 60% diversion rate for through-state freight to rail;

• Evaluate project financing alternatives …

• Include … cost savings from using rail compared to over-the-road driving;

• Include analysis of a full range of future fuel price scenarios…